Location:Home >> IndustryNews

High pressure blower installation the matters needing attention
-SHANGHAI LIONGOAL http://www.86ehs.com Date:2011-10-20

1, must use flat washer and spring washer to step up screw;
2, best can use rubber buffer glue to bear the weight of the high pressure blower, especially high power high-pressure blower, indispensable;
Three, for some of the noise that requires occasions, can be attached with muffler to reduce noise (usually, about 5 dB in or so), muffler installed in into the pipe or out of the end of the wind pipe;
4, for some high requirements for noise of occasions, and may, according to the conditions of the machine itself, add a layer or a mute, can meet the requirements of the noise, and the specific can inquire high-pressure blower factory or professional noise management company;
5, in use censored or censored, notice the high-pressure blower and the distance, pay attention to high pressure of the fan ventilation and cooling, pay attention to use rubber buffer glue to bear the weight of turbo fan, specific need to consult the manufacturer of high pressure blower, such as the rise high pressure blower, Siemens, and so on;
6, high pressure blower into outlet pipe connection of, hose connection should be used to isolate vibration.
 

Previous:

Next:

BRAND PARTNERS
Express